Engaged on TRS sheds involved in overhauling and assembly level maintenance of 25KV AC electric powered locos in electrical loco sheds is the worker’s duty. Candidates making ready for several other RRB tests can Look at the following backlinks for in depth preparation and revision- A major advantage of the https://railway-recruitment56777.activosblog.com/31272563/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf